Trench Time

The past month saw much accomplished on the work site. The retention pond is now complete and awaits spring grass. The drainage system piping drainage water from the new buildings to the retention pond has also been completed. A look around the work site reveals that the steel has also been delivered. The pouring of the west curb for the west parking lot also reveals a little of what is to come. The west retaining wall will also be installed shortly. However, the two most obvious items of change reside in the work done for the new chapel and gym. This week the footings for both were trenched out. Once the ground sample reveal the ground is ready, the footings will be poured. The final exciting accomplishment is the installation of the south door for the old gym and a new side walk running between building 4 and the old gym. Please continue to pray as the work is ongoing.